Summary
JHR baking-free lightweight refractory castables applied in heating furnace maintenance sharply cut furnace drying waiting time and equipment shutdown duration, enabling rapid resumption of furnace production for the customer.


Content
For the annual maintenance of the heating furnace in Hefa Rongju Project undertaken by CISDI Chongqing, conventional lightweight castables were originally selected for lining repair, which required lengthy ambient curing and staged heating treatment after casting. The full drying procedure took 12 days, creating tight maintenance schedules and heavy pressure on scheduled commissioning.During the maintenance in June 2026, the project contractor adopted JHR’s composite solution combining lightweight castables and special baking-free refractories for all repair zones including furnace roof, flue and sidewalls. JHR assigned dedicated refractory engineers to supervise full on-site casting and surface finishing operations. All delivered materials passed volume density, high-temperature linear change and modulus of rupture testing with all indicators fully compliant, delivering remarkable on-site performance advantages: